Include the measurement from the house
inlet to the bottom of the trench |
 |
Include the measurement from the stove
connections to the bottom of the trench |
 |
Allow enough length inside for easy
splicing |
 |
Consider adding additional footage for an
uneven trench, avoiding tree roots, rocks, etc... |
 |
For stove cement pad installs, if
possible, install ThermalBarrier insulated pipe first, then add the cement
pad. This ensures the correct length for the water lines.